2000-04-03 G-70-153-AD Dresser/Wayne WayneVac Phase II Vapor Recovery System

This page last reviewed October 22, 2008

Executive Order G-70-153-AD

Executive Order G-70-153-AD

Modification to the Certification of the Dresser/Wayne WayneVac Phase II Vapor Recovery System (PDF Format 836K)

The above document is also available below in its 24 subparts:


Exhibit 1 & Exhibit 2 Legal, Equipment List & Specifications (Acrobat 47K)
Figure 1A-1 OPW Model 11VAI Nozzle with Vapor Valve (Acrobat 63K)
Figure 1A-2 Husky Model V34 6200-4 Nozzle (Acrobat 39K)
Figure 1A-3 Husky Model V34 6200 Nozzle (Acrobat 51K)
Figure 1A-4 Husky Model V34 6250 Nozzle (Acrobat 50K)
Figure 1A-5 Emco Wheaton A4505 Nozzle (Acrobat 223K)
Figure 1A-6 Catlow ICVN Nozzle (Acrobat 26K)
Figure 1A-7 Richards Astrovac Nozzle (Acrobat 45K)
Figure 1A-8 OPW 12VW Nozzle (Acrobat 33K)
Figure 1B-1 WayneVac Retrofit Gilbarco MPD's (Acrobat 25K)
Figure 1B-2 Dispenser Retrofit Identification (Acrobat 42K)
Figure 2A-1 Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 192K)
Figure 2A-2 Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 152K)
Figure 2A-3 Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 189K)
Figure 2A-4 Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 196K)
Figure 2A-5 Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 136K)
Figure 2B-1 Hose Configurations and Possibilities For Vista and Nonvista Dispensers (Acrobat 43K)
Figure 2B-2 Hose Configuration Option (Acrobat 74K)
Figure 2C Instructions for use of the 6250 A/L Adaptor (Acrobat 62K)
Figure 2D Installation of A/L Adaptor (Acrobat 26K)
Exhibit 3 Static Pressure Integrity Test (Acrobat 99K)
Form 3 Summary of Source Test Results (Acrobat 9K)
Table 3-1 Pressure Decay Leak Rate Table (Acrobat 4K)
Exhibit 4 Ten Gallon Per Minute Requirement (Acrobat 5K)

Phase II Executive Orders

preload