Executive Order G-70-187

Released: September 13, 1999


Executive Order G-70-187 - Certification of the Healy Model 400 ORVR  Vapor Recovery System for Aboveground Storage Tank Systems (Acrobat 960K)

The above document is also available below in it's 23 subparts:

(Acrobat 10K)
Healy Model 400 ORVR Nozzle System Equipment List (Acrobat 7K)
Specifications for the Healy Model 400 ORVR Vapor Recovery System for Aboveground Storage Tank Systems (Acrobat 28K)
Exhibit 2 Figures
Healy 400 ORVR Nozzle (Acrobat 65K)
9000-01 Mini-Jet Installation - Jet Pump Assembly (Acrobat 114K)
9000-01 Mini-Jet Installation - Storage Tank Assembly (Acrobat 11K)
9000-02 Mini-Jet Installation - Jet Pump Assembly (Acrobat 44K)
9000-02 Mini-Jet Installation - Storage Tank Assembly (Acrobat 17K)
VP500 Central Vacuum Vane Pump Assembly (Acrobat 124K)
100 Jet Pump w/Self-contained Suction Pump (Acrobat 152K)
100 Jet Pump w/Turbine Pump  (Acrobat 50K)
Healy Monitoring System Layout (Acrobat 35K)
System Monitor Control Box (SMCB) (Acrobat 36K)
6299 Intrinsically Safe Module  (Acrobat 27K)
9800-1 Vacuum Monitor Pressure Switch  (Acrobat 22K)
Vent Piping Detail (Acrobat 11K)
Vent Manifold Assembly  (Acrobat 9K)
6275 System Monitor Vent Sensor (Acrobat 61K)
Monitor Maintenance Log Sheet (Acrobat 5K)
Static Pressure Integrity Test Aboveground Storage Tanks, Table 3-1, and Form 3-1 (Acrobat 107K)
Vapor Return Line Vacuum Integrity Test for the Healy Model 400 ORVR System (Acrobat 9K)
Fillneck Vapor Pressure Regulation Fueling Test (Acrobat 46K)
Ten Gallon Per Minute Limitation Compliance Verification Procedure (Acrobat 5K)


Superseded Executive Order Archives

preload