Off-Road Refueling Spillage Control Regulation

This page last reviewed January 13, 2005

Proposed Portable Fuel Container Spillage Control Measure

The proposed ARB Portable Fuel Container Spillage Control Measure will eliminate spillage emissions from off-road mobile sources that are refueled using portable containers. Through the implementation of a "spill proof" portable refueling system that employes an automatic stop flow feature, refueling spillage can be virtually eliminated. These same "spill-proof" systems employ an automatic shut-off feature that will substantially mitigate transport, storage, and diurnal losses from the portable containers. Since portable containers are used to refuel a broad range of off-road vehicles and equipment, these emissions are significant. A conservative estimate of hydrocarbon (HC) emissions from spillage alone is approximately 15 tons per day.
WHAT'S NEW
This area includes announcements of recent activities such as workshops and meetings. As meetings and workshops are scheduled, agendas and supporting documents will be made available in this area.
  • Test Protocol and Results for the Determination of Permeation Rates from High Density Polyethylene Containers and Barrier Surface Treatment Feasibility Study


WHERE CAN I GET MORE INFORMATION?
For more information, please contact Dean Bloudoff at (916) 263-2070 or via email at dbloudof@arb.ca.gov or Cindy Castronovo, Manager, Testing Section at (916) 263-1628 or via email at ccastron@arb.ca.gov.



'Portable Fuel Container Spillage Control Measure

preload